Strata solar and EV projects: by‑laws, metering and who pays what

Written and reviewed by · Last reviewed

A decision-grade guide to by-laws, metering and cost sharing for solar and EV projects in Australian strata schemes, with practical steps owners can act on this week.

Published 25 Nov 2026Updated 25 Nov 20269 min read

Key Takeaway

This article explains how to structure by‑laws, metering and cost sharing for solar and EV projects in Australian strata schemes so owners can vote with confidence. It compares embedded networks versus individual metering, outlines how by‑laws should allocate rights and obligations, and shows how per‑lot modelling improves buy‑in. A key insight is that clear, project‑specific by‑laws plus transparent levy impact tables significantly reduce disputes and stalled upgrades, enabling projects to progress this quarter.

Watch the short answer

Old phone or utility defaults on your credit report

This video shows how older credit defaults affect loan approvals and what brokers can do differently.

Read the transcript

If you have a 5-year-old unpaid phone bill or utility default on your credit report, mainstream bank apps will hit 'decline' instantly. They don't look at the context, they look at the score. At Local Knowledge Finance, we do the opposite. We workshop your file directly with specialist underwriters who evaluate your financial health today, not a mistake from half a decade ago. Don't let an automated glitch hold back your property goals. DM me, 'RESET' to fix your trajectory.

General information only, not personal advice. Your situation is assessed before any recommendation.

Strata solar and EV projects: by‑laws, metering and who pays what

If you want solar panels or EV chargers in a strata building, you need three things sorted early: clear by‑laws, a workable metering setup, and a cost‑sharing model owners see as fair. Until those are pinned down in writing, it’s almost impossible to choose the right finance or get a special resolution over the line.

In practice, every viable strata energy project answers four questions: what can be installed, who can use it, how is usage measured, and who pays what (and when). Get written, project‑specific by‑laws to lock in those answers before you sign any contracts.

Strata committee reviewing by-laws for a solar project. Clear, project-specific by-laws are the backbone of successful strata energy upgrades.

1. Start with the project structure, not the hardware

Before arguing about brands of panels or chargers, decide the basic structure of the project.

Common models used in Australian strata

  1. Common-property solar, benefit by levies
    OC (owners corporation / body corporate) owns and funds solar; savings reduce common power bills (lifts, lights, pool). Owners benefit indirectly via lower levies.

  2. Shared solar / EV infrastructure with allocation rules
    OC owns infrastructure (solar, backbone cabling, load management), but usage is metered to individual lots via sub‑meters or software. Owners pay a share of capital costs plus usage.

  3. Embedded network with third‑party operator
    An energy provider funds and owns much of the kit (sometimes via a PPA). They bill owners/tenants directly, and the OC gets a site agreement and sometimes a rebate.

  4. Exclusive-use upgrades for specific lots
    Example: a small solar array over a townhouse lot or an EV charger in a dedicated car space, funded by that owner with OC permission.

Choosing the model affects by‑laws, metering and finance. For financing pros and cons of each structure, see How To Fund Solar, Batteries And EV Chargers In Strata Buildings.

2. Core by‑law decisions for solar and EV projects

By‑laws are where projects either become bankable and enforceable or fall apart. You want a project‑specific by‑law (or set of by‑laws), not vague generic wording.

Key issues your by‑laws should cover

At minimum, your solar/EV by‑laws should deal with:

  • Ownership – who owns panels, chargers, cabling and meters (OC, a subgroup, or an external provider).
  • Access and works – rights to install, maintain, upgrade, and remove equipment; safe access to roofs, car parks and switch rooms.
  • Rights of use – which lots can use which chargers, how new participants can join, and any priority or booking rules.
  • Cost allocation – how capital costs, finance costs and running costs are split and recovered.
  • Damage and reinstatement – who is responsible if the system damages common property or lots.
  • End‑of‑life / exit – what happens if the system fails, becomes obsolete, or owners vote to change supplier.

If a strata loan is involved, align your project by‑laws with the borrowing by‑law and lender conditions. Legal Safeguards For Strata Loans: By‑Laws, Security And Owner Rights is a useful parallel checklist.

Embedded networks and by‑law changes

Embedded network and PPA deals usually require:

  • A long‑term site agreement (often 10–25 years).
  • By‑laws granting access, specifying meter configuration, and approving on‑charging arrangements.
  • A clear termination pathway and buy‑out rules.

Scrutinise:

  • How prices are set and escalated.
  • Dispute resolution process.
  • What happens if an owner wants to opt out or sell.

You’re effectively outsourcing part of the building’s energy infrastructure, so treat it as a major contract, not just a cheaper power bill.

3. Metering choices: simple today vs flexibility tomorrow

Your metering setup determines how fairly energy and EV charger use can be billed and how easily the scheme can change provider later.

Common metering arrangements in strata upgrades

Metering optionTypical use caseProsCons / risks
Bulk supply + OC common meter onlySolar for lifts/foyers onlySimple, low adminNo direct benefit per lot, limited flexibility
Bulk supply + individual sub‑metersShared solar/EV for participating lotsFairer allocation, scalableHigher upfront cost, needs clear by‑laws
Full embedded networkWhole‑building retail & solar / batteriesCentral control, potential tariff gainsComplex, lock‑in risk, regulatory obligations
Stand‑alone meters per chargerIndividual EV baysClear per‑user billingSpace limits, harder to manage shared capacity

When comparing offers, insist on a like‑for‑like table of:

  • Who owns each meter.
  • Who can read it.
  • Who can change retailer.
  • What it costs to add a new lot later.
Premium insight

The strategy continues below

You've seen the problem and the groundwork — now unlock the exact steps our CPA and Registered Tax Agent-led brokers use, including 3 more sections. Enter your email for instant, free full access.

Free access. No spam — unsubscribe anytime. Your details stay confidential.

Frequently asked questions

In most Australian states, significant changes to common property or new exclusive-use rights require a special resolution. Some jurisdictions have made it easier to approve sustainability infrastructure, but you still need properly drafted motions and meeting procedures. A strata lawyer should confirm the threshold and documentation that apply in your scheme’s state and type.
That depends on the project structure and by-laws. If the work is classed as a general building improvement, costs are often shared by unit entitlement, even if not everyone uses the facility. Many schemes reduce conflict by adopting participation-based or hybrid models so those who benefit most pay more, backed by clear per-lot modelling.
Obligations and rights created by by-laws and levies usually attach to the lot, not the individual owner. When the property is sold, the new owner takes on ongoing levies and any usage charges. Buyers and lenders therefore need access to project by-laws and levy schedules as part of their contract and finance checks.
Exiting an embedded network is usually possible but can involve notice periods, exit fees and meter reconfiguration. The difficulty largely depends on the original contract and how meters and ownership were set up. Negotiating clear exit and transition clauses up front, and reflecting them in your by-laws, makes future changes much easier.